Kolkata-Sairang Express

The 13125 / 13126 Kolkata–Sairang Express is an express train belonging to Eastern Railway zone that runs between the capital city Kolkata of West Bengal and Sairang, the city... Wikipedia

  • Service type:  Express
  • Locale:  West Bengal, Bihar, Assam and Mizoram
  • First service:  September 13, 2025 (Inaugural) September 16, 2025 (Commercial)
  • Current operator(s):  Eastern Railway (ER)
  • Start:  Kolkata (KOAA)
  • Stops:  26
  • End:  Sairang (SANG)
  • Distance travelled:  1,485 km (922.74 mi)
  • Average journey time:  31 hrs 20 mins
  • Service frequency:  Tri- Weekly
  • Train number(s):  13125 / 13126
  • Class(es):  General Unreserved (GS) Sleeper Class (SL) AC 3 Tier Class AC 2 Tier Class
  • Seating arrangements:  Yes
  • Sleeping arrangements:  Yes
  • Catering facilities:  No
  • Observation facilities:  Large windows
  • Baggage facilities:  No
  • Other facilities:  Below the seats
  • Rolling stock:  LHB coach
  • Electrification:  No electric line from Tufanganj to Sairang 25 kV 50 Hz AC overhead line
  • Operating speed:  120 km/h (74.56 mph) maximum, 47 km/h (29.2 mph) average including halts.
  • Track owner(s):  Indian Railways
  • Data source:  DuckDuckGo
SEARCH SIDEBAR AD
PRE SEARCH RESULTS AD
POST SEARCH RESULTS AD